Independence Day (Office Closure)

Flathead Electric Cooperative offices in Kalispell and Libby will be closed Thursday, July 4 in observance of the holiday. We will reopen on Friday, July 5, at 8:00 A.M.

Close

Search Results

Irrigation Service Rates

https://www.flatheadelectric.com/faqs/irrigation-service-rates/
Irrigation Service Rates (PDF) (irrigation services 50 kW or greater) Basic Charge: $561.55 per year Demand Charge: $5.04 per kW Energy Charge: Winter On-Peak $0.07394 per kWh Summer On-Peak $0.05861 per kWh Winter Mid-Peak $0.04294 per kWh Summer Mid-Peak N/A Winter [...]

Smart Thermostat Rebate

https://www.flatheadelectric.com/energy-solutions/energy-efficiency-rebate-programs/residential-rebate-programs/smart-thermostats/smart-thermostat-rebate/

[…] Any required maintenance, repair, or replacement of the EEM shall be the sole responsibility of, and at the expense of the Owner(s). The Owner(s) understands FEC hereby disclaims any and all implied or express warranties (including but not limited to implied warranties of merchantability or fitness for a particular purpose) for the EEM. I […]

Medium General Service Rates

https://www.flatheadelectric.com/faqs/medium-general-service-rates/
Medium General Service Rates (PDF) (non-residential services 50 kW to less than 100 kW) Basic Charge (single-phase service): $38.47 per month Basic Charge (three-phase service): $53.09 per month Demand Charge: $2.67 per kW Energy Charge: $0.05513 per kWh Reactive Power Charge: [...]

Large General Service Rates

https://www.flatheadelectric.com/faqs/large-general-service-rates/
Large General Service Rates (PDF) (non-residential services 100 kW to less than 400 kW) Basic Charge: $64.24 per month Load Size Charge: $1.26 per kW Demand Charge: $3.43 per kW Energy Charge: $0.04663 per kWh Reactive Power Charge: $1.29 per kVAR [...]

Lighting Security Service Rate

https://www.flatheadelectric.com/faqs/lighting-security-service-rate/
Lighting Security Service Rate (PDF) 70 or 100 watt, High Pressure Sodium (HPS) $9.10 per month 200 watt, HPS $11.54 per month 400 watt, HPS $17.96 per month 175 watt, Mercury Vapor (MV)* $10.94 per month 400 watt, MV* $18.72 [...]

Industrial Service Rates

https://www.flatheadelectric.com/faqs/industrial-service-rates-2/
Industrial Service Rates (PDF) (services 1,000 kW or greater) Basic Charge: $350.81 per month Load Size Charge: $1.57 per kW Energy Charge: $0.04189 per kWh Demand Charge: $23.99 per kW Reactive Power Charge: $1.29 per kVAR Primary Meter Discount: -1.5% of [...]

Extra Large General Service Rates

https://www.flatheadelectric.com/faqs/extra-large-general-service-rates-2/
Extra Large General Service Rates (PDF) (non-residential services 400 kW to less than 1,000 kW) Basic Charge: $107.28 per month Load Size Charge: $1.53 per kW Energy Charge: $0.04915 per kWh Demand Charge: $19.17 per kW Reactive Power Charge: $1.29 per [...]

Large General Service Rates

https://www.flatheadelectric.com/faqs/large-general-service-rates-2/
Large General Service Rates (PDF) (non-residential services 100 kW to less than 400 kW) Basic Charge: $64.24 per month Load Size Charge: $1.26 per kW Energy Charge: $0.05631 per kWh Demand Charge: $15.41 per kW Reactive Power Charge: $1.29 per kVAR [...]

Medium General Service Rates

https://www.flatheadelectric.com/faqs/medium-general-service-rates-2/
Medium General Service Rates (PDF) (non-residential services 50 kW to less than 100 kW) Basic Charge (single-phase service): $38.47 per month Basic Charge (three-phase service): $53.09 per month Energy Charge: $0.07508 per kWh Demand Charge: $12.77 per kW Reactive Power Charge: [...]

Community Solar III

https://www.flatheadelectric.com/about-my-co-op/how-we-provide-power/community-solar/community-solar-iii/

[…] Any Co-op member may purchase the generation output from up to 5 panels*. The project will be sold on a first-come, first-served basis. Purchase price is $700 per 540-watt panel. A non-refundable down payment of $75 per panel is required to secure a portion of the project. The remaining balance will be due this […]